During this project, we undertook a five-month site installation of 216No suppression bottles and 54No detectors along with the electrical wiring. 

This project included carrying out detailed site surveys to look at the mechanical and electrical installation. We had to work closely with IEP and RWE to agree on installation locations to ensure it met the design criteria requirements and also so it was easily accessible for future maintenance requirements after the installation was completed. 

We designed, fabricated and installed all bracketry for the suppression and detector equipment. The project had to be completed within the allocated shutdown period, and delivered on time and to budget.