Fabricated over approximately 6-8 weeks, Walker Engineering fabricated and welded a vertical stainless steel storage tank from 5mm thick shell 304 stainless steel and delivered it to a site in Manchester. The mild steel, rubber-lined horizontal tanks were externally painted with two pack white epoxy paint on the external part. Walker Engineering delivered the vessels along with stainless steel pipework for the project in Europe. For transporting the vessels, we manufactured support cradles. The total project from drawings to delivery lasted approx. 3 months.